 |
 |
 |
|
BSW-01 Paraseal LG
installation over wood lagging with steel piles |
BSW-02 Paraseal LG
installation over
steel sheet piling |
BSW-03 Paraseal LG
installation
over augered caisson |
 |
 |
 |
|
BSW-04 Paraseal LG
installation over shotcrete with concrete piles |
BSW-05 Paraseal LG
installation
over a slurry wall |
BSW-06 Paraseal LG
installation over chemically stabilized earth |
 |
 |
 |
|
BSW-07 Interrupting
Paraseal LG at vertical soldier piles - plan view |
BSW-08 Installing Paraseal
LG directly over steel soldier pile - plan view |
BSW-09 Installing Paraseal
LG over lagging board gaps - plan view |
 |
 |
 |
BSW-10 Paraseal LG
installation
over a slurry wall |
BSW-11 Paraseal LG
installation
at studs or form tiles |
BSW-12 Paraseal LG
installation
at tie-back |
 |
 |
 |
|
BSW-13 Paraseal LG
installation at tie-back- blockout method |
BSW-14 Paraseal LG
installation at horizontal blindside to backfilled transition |
BSW-15 Closing off the top
of infill material between lagging and wall |
 |
 |
 |
|
BSW-16 Typical temporary
termination at top of earth retaining system |
BSW-17 Paraseal LG
installation
at wall penetration |
BSW-18 Blindside walls.
Termination above grade |
 |
 |
 |
|
BSW-19 Below grade
waterproofing. Termination at grade line |
BSW-20 Paraseal LG
installation at concrete pilaster - plan view |
BSW-21 Expansion joint -
plan view |
 |
 |
 |
|
BSW-22 Paraseal LG
installation at blindside to backfilled transition - plan view |
BSW-23 Paraseal LG
installation at wall to below floor tie-in (see Section C) |
BSW-24 Proper installation
of shotcrete against Paraseal LG |
 |
 |
 |
|
BSW-25 Termination at top
of deck |
BSW-26 Paraseal LG
installation installation at jog in lagging walls - plan view |
BSW-27 New wall to existing
wall
tie-in - plan view |
| |
 |
|
| |
BSW-28 Proper anchoring of
Paraseal seams |
|