The
Project:
2B Alberon Street, Parnell, Auckland
Date:
January
2006
The Client:
The Requirement:
Two adjoining townhouses were leaking from various areas of the
building.
The Solution:
One coat of Chevaline Coverall Primer followed by Tremco
Tremflex 834, a Chevaline Coverflexx strip coat over the 834,
then one full coat of Coverflexx over the entire building,
followed by a finish coat of Chevaline Earthen.