The
Project:
Kelvin Hotel, Invercargill
Date:
2003-2004
The Client:
Mollison & Associates, Invercargill
The Requirement:
To clean, prepare and refurbish the entire external surfaces to
the building. Also to waterproof balconies, parapets and ledges
with Chevaline Dexx.
The Solution:
Technically a complex project with a wide variety of different
products for different surfaces. A lot of surface preparation
required, such as rust neutralisation, plaster repair, cleaning
and brick preparation. A variety of Equus systems used each with
its own specific primer, bodycoat and topcoat. Equus quality
control and applicator accuracy on the project was excellent.